Commercial Building Construction

Commercial Building Construction, Situated on Maulana Azad Road, directly opposite M.M. High School in Panayapally, this building stands as a testament to modern construction excellence.

Let’s delve into the construction highlights and additional details of this impressive three-story structure:

  1. Foundation: Robust R.C.C. raft and beam foundations support the building’s foundation, ensuring its stability and longevity.
  2. Superstructure: The superstructure boasts a sturdy R.C.C. framed structure, complete with columns, beams, and slabs, further enhancing its structural integrity.
  3. Roofing: We impeccably execute the roofing using high-quality aluminium roofing sheets, providing durability and protection from the elements.
  4. Flooring: Throughout the interior, elegant 800 x 800 cm vitrified tiles adorn the floors, offering both aesthetics and practicality.
  5. Aesthetics: To enhance the overall aesthetics of the building, we have incorporated external wall tile cladding and provisions for gardens.
  6. Security: The building is equipped with a state-of-the-art biometric locking system, ensuring top-notch security for its occupants.
  7. Eco-friendly: A hybrid solar system with 100% load-bearing capacity has been installed, reflecting a commitment to sustainable energy solutions.

Construction Highlights:

Commercial Building Construction
Additional Details:
  • Ground Floor Flooring: The ground floor features premium vitrified tiles, exemplifying a dedication to quality in every aspect of the construction.
  • Bathrooms: We outfit all bathroom floors with anti-skid ceramic tiles, complemented by dado work featuring glazed tiles for both safety and style.
  • Walls: We meticulously plaster the interior and exterior walls with a 15 mm thick cement mortar mix in a 1:4 ratio, ensuring a flawless finish.
  • Water Supply: The building features a ground-level water tank with a 1000-litre capacity, while an overhead water tank adds an additional 1500-litre capacity, guaranteeing a reliable water supply.
  • Sanitary and Plumbing: We have used high-quality sanitary fittings from ‘Hindware’ coupled with Jaguar water supply fittings, showcasing a commitment to excellence in plumbing.
  • Electrical: We execute electrical wiring using high-grade Finolex wires, emphasizing safety and reliability.
Project Timeline:

Construction of this remarkable building commenced in June 2016, with the structural work completed by October 2016, well ahead of schedule. Ongoing exterior beautification efforts continue to enhance its overall appeal.

For inquiries regarding design and project details, please feel free to reach out to us.