Construction of Multi-Storied Apartment at Thoppumpady
This three-storied apartment with a plinth area of 129.80sm on the ground floor was built for Mr Mohan Varghese.
The construction of this building started on 02-Feb-2011 and was completed on 07-Dec-2012 well before the agreed time.
Additional Details:
-
RCC was carried out for the Building with 35 no's of 450mm dia Piles and 17 no's of RCC Columns.
-
Flooring is done with first quality Vitrified Tiles on the ground floor.
-
1 and 2nd floors are done with Ceramic tiles.
-
All Bathroom floors are Anti-skid Ceramic tiles and dado with glazed tiles.
-
Walls are plastered with cement mortar 1:4, 15mm thick inside and outside.
-
This Building is provided with a ground-level water tank of capacity 5000 litres
-
Overhead, the Water tank has a capacity of 6000 litres.
-
All the tanks are RCC tanks.
-
High-quality sanitary fittings from 'Hindware' along with water supply fittings from Jaguar make was used.
-
Electrical wiring is done with high-grade Finolex wires.
-
All the light fittings are of Bajaj and Fans from Crompton.
-
This Apartment also provided a facility for rainwater harvesting.
- Truss Work with Aluminium Sheets.
The apartment has all the modern facilities to accommodate five families. On which one apartment is on the ground floor, and two apartments on the first and second floor.