Building Design & Construction Forum

Ask Questions Related to Civil Engineering, Constructions, Structural, Electrical, Building Materials, Koi Ponds, Pools and More.

Damp Proofing

TOPIC:

Damp Proof Course 6 years 3 months ago #53

  • Tony's Avatar Topic Author
  • Tony
  • Offline
  • Moderator
  • Moderator
  • Posts: 107
  • Karma: 8
  • Thanks: 11
Damp proofing course is laid above the ground level adjoining plinth level of the building in the entire width of the wall. However it is kept below the floor
level. The thickness of the DPC (Damp Proof Course) varies between 12 mm to 20 mm. At certain places it may be 40 mm thick also. It is also provided below the sill level of the doors.When the brick work reaches plinth level a special type of mix known as Damp proofing compound is mixed with cement and sand
(1 : 2) with adequate amount of water and is laid in the full width of the brick work below it. The thickness of this layer is usually kept at 2.5 cm unless and until specified otherwise. This layer prevents the dampness to rise above.

Please Log in or Create an account to join the conversation.

Last edit: Post by Tony.
  • Page:
  • 1
Time to create page: 0.054 seconds

Information

logo
KJA & Sons - Engineers and Contractors
CC – 15/ 68 A, West Karuvelipady, 
Kochi – 682005

We Build Your Dreams

Follow Us: